The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to United Kingdom in £. L
The ceramic catalyst filter and high-temperature ceramic fiber filter for denitrification, desulfurization, dust removal, removal of dioxins/HCl/HF Supply to United Kingdom in £. L
Contact us for more information about | United Kingdom
Contact us for United Kingdom
Contact Us
ZTW Environmental Protection Technology Co., Ltd. focuses on the field of industrial flue gas treatment, and is committed to providing integrated solutions for denitrification, desulfurization, defluorination, dust removal and ammonia removal with ceramic catalytic filter tubes and ceramic fiber filter tubes as core technologies. Relying on the concept of ceramic integrated design, the company integrates catalysis, filtration and dust removal functions into high-performance ceramic tubes. Its denitrification efficiency is more than 95%, and its dust removal efficiency exceeds 99.99%, which is suitable for high-pollution industries such as glass kilns, steel, and coking.
ZTW Tech supplies ceramic catalytic filter elements and ceramic fiber filter elements to United Kingdom industrial operators. Local project pricing is quoted in £ (GBP), and every quotation includes technical drawings and a technical data sheet in metric units.
Key industries served in United Kingdom
glass manufacturing
coking and steel
waste incineration
chemical processing
ceramic and brick kilns
Standards and compliance for United Kingdom
BS EN 1294 (filter media)
BS EN ISO 16890-1
UKCA / CE marking
UK Environment Agency guidance
Applications by industry
Glass manufacturing
Float and container glass kilns at 1400-1600°C. Ammonia dosing is already in place on most UK lines, so the retrofit is normally limited to the kiln hood and the flue gas path rather than the combustion system.
Coking and steel
Coke oven batteries and sinter plant off-gas at 300-450°C with high particulate loading. Hot-end filtration below 550°C is where ceramic elements replace baghouses that would otherwise need frequent bag changes.
Waste incineration
Energy-from-waste and clinical waste incinerators with flue gas temperatures of 850-950°C. Ceramic fibre elements cover the high-temperature sections where PTFE bags fail and where the gas has to be cleaned before the energy recovery boiler.
Regulatory compliance in United Kingdom
Emission limits in the UK are set through the Environmental Permitting Regulations 2016 and the conditions attached to each local authority permit. Filter media supplied into Great Britain is commonly specified to BS EN ISO 16890-1, and UKCA marking alongside CE marking remains acceptable for industrial equipment. Permit conditions normally require a documented emission calculation and periodic monitoring by an accredited UKAS body.
Supply, lead time and logistics
Quotations are issued in GBP with 30-day validity. Standard elements ship from Beijing and Shanghai by sea, typically 25-35 days to Felixstowe or London Gateway, and 7-10 days by air freight for urgent replacement orders. Common diameters are held in stock and can be dispatched within 3 days, with installation drawings and torque specifications included.
United Kingdom
Technical support is provided in English with £ quotation and local lead-time guidance. Request a free filter sample or discuss an OEM / ODM programme.
Search coverage for United Kingdom
Content for United Kingdom is indexed in Google UK, Bing UK, Yandex, DuckDuckGo.
UK
Britain
English
Northern Ireland
Scotland
Wales
Frequently asked questions
Are ceramic catalytic filters approved for use in the UK?
They are supplied with CE and UKCA marking, a technical data sheet and test reports for permeability and hot strength. The media classification basis is EN 1294 / ISO 16890, which is what UK permit conditions and tender documents usually reference.
What is the realistic lead time to the United Kingdom?
25-35 days by sea for standard elements and 7-10 days by air for urgent replacement. Stocked diameters ship within 3 days. Each quotation states the manufacturing window, the shipping route and the estimated arrival date so the shutdown window can be planned.
Do you support UK installation contractors?
Yes. We supply installation drawings, torque specifications and commissioning checklists, and we support third-party installers with remote technical support and on-site attendance at the commissioning of larger projects.
ZTW
We will reach you within 1 hour.
2026-11-26 03:33:10
Hello, welcome to ZTW. Please reach out to us at any time.
We have received your ticket and will get back to you within 24 hours.